|
|
Access to manifacturing zones. PharmaceuticalThis case needed three different contamination control zones at the access to restricted and critical production zones. |
|
|
Case study: changing room access to cleanroom. Food packagingThis case is of a changing room before the direct access to a clean environment dedicated to packing under modified atmosphere in a food industry (ham manufacturer) . |
|
|
Access from changing room to production area. PharmaIn this case it is required to offer a protection and to decontaminate the passage of the operators traveling along in both directions, starting from the changing room area, toilets etc. |
|
|
Access to production zoneAccess to production from a warehouse area. The contamination control mat has been placed as a invisible barrier trough the warehouse zone for packing and raw materials etc.. |
|
|
E.P.A. zoneRealization of an E.P.A. zone inside a manufacturing plant. |
|
|
CASE STUDY: Contamination control mat Edging ReplacementThis time cumstomer, after changing place to the mat, was forced to replace the old edging with a brnad new one. The new edging is highly visible with red stripe |
- ‹ precedente
- 13 of 16
- seguente ›
