|
|
CASE STUDY: Contamination control mat Edging ReplacementThis time cumstomer, after changing place to the mat, was forced to replace the old edging with a brnad new one. The new edging is highly visible with red stripe |
|
|
E.P.A. zoneRealization of an E.P.A. zone inside a manufacturing plant. |
|
|
ACCESS TO AN EPA CLEAN ROOM. EMS 01The contamination control mat WZ has been installed onto the access ramp to an E.P.A. |
|
|
Access contamination control to clean environmet. Medical devicesIl cliente necessita di proteggere diversi tipi di accessi sia direttamente dall’esterno dello stabile che all’interno della zona critica e dell’accesso alla camera pulita. |
|
|
Pedestrian access to the manufacturing area. CosmeticsCustomer needed to protect different “in and out” access zones for operators: |
|
|
Acces to production and common areasThis is the case where the management of a manufacturing cosmetic company needed to solve two different problems of contamination control in his layout. |
- ‹ precedente
- 16 of 18
- seguente ›
